Powerstown Education Campus

The two schools each consisted of 16 classrooms. In addition the ETNS had 2 classbase SNUs. Both schools contained other resource and teaching rooms, administration and circulation space.Site works consisted of 2 ball courts, junior play areas, disabled set down and parking, soft and hard landscaping, bin stores, bike sheds and car parking.Upgrading of the exisitng school entrances, external fencing and new public footpaths to the front of the site.The success of this Rapid Build Schools project was built around the speed in which the structure was erected and then how quickly the internal finishes could logically commence without jeapordising quality.To achieve these goals the following rapid construction techniques were used as well as aggressive methods of programming and co-ordination of the works. These methods were managed by a skilled site team with experience of similar projects.

 

JOB 3451 ABM POWERSTOWN GS 26.07.2017-6628 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6623 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6589 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6569 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6423 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6299 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6359 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6364 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6355 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6564 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6487 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6435 JOB 3451 ABM POWERSTOWN GS 26.07.2017-6589